Log In needed £5 · Table lamp multicolour mosaic green lampshade long lead 39cm high
Report Adtable lamp base mosaic with green lampshade and with long lead
Approx. height of the base is 39cm or 15.5"
The lampshade is still brand new with wraping
Collection from Penn WV4 4AJ
Ad #
25830080Posted
January 11, 2018Renewed
May 19, 2018Expiry
June 18, 2018Status
SOLDCategory
Household › Accessories › LampsEdit
My adToday | Yesterday | To Date | |
---|---|---|---|
Views | |||
Browsed |